Rack Installation 2-15
Compaq Confidential Need to Know Required
Writer: Jennifer Hayward Project: Compaq ProLiant ML350 Generation 2 Tower-to-Rack Conversion Guide Comments:
Part Number: 236991-001 File Name: c-ch2 Installing.doc Last Saved On: 6/19/01 8:36 AM
Installing the Cable Management Arm
The cable management arm secures to the cable management arm bracket that
was previously installed. See Installing the Cable Management Arm Bracket
in Chapter 1. All cables running to and from the server are tied to this arm.
The cable management arm allows the cables to swing out of the way when
the server is accessed.
To install the cable management arm, follow these steps:
1. Slide the server into the rack. See Installing the Server into the Rack
earlier in this chapter.
2. Secure one end of the cable management arm to the cable management
arm bracket on the server using two M6 x 1.0-12L Phillips screws
(supplied).
Figure 2-8. Securing the cable management arm to the bracket
NOTE: The rear of the server may look different depending on the model purchased.
3. Align the other end of the cable management arm with the outside of
the rear rack frame.
Vedere la pagina 38