Chapter 2
Rack Installation
This chapter provides the procedures required to install the prepared Compaq
ProLiant ML350 Generation 2 server into a Compaq 19-inch-wide rack.
Installing the prepared server into the rack requires the following steps:
Securing the mounting hardware to the server and rack
Installing the server into the rack
Securing the cable management arm
Cabling the server