Compaq ML350 - ProLiant - G2 Specifiche Pagina 27

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 48
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 26
Rack Installation 2-3
Compaq Confidential Need to Know Required
Writer: Jennifer Hayward Project: Compaq ProLiant ML350 Generation 2 Tower-to-Rack Conversion Guide Comments:
Part Number: 236991-001 File Name: c-ch2 Installing.doc Last Saved On: 6/19/01 8:36 AM
WARNING: This equipment is designed for connection to a grounded (earthed)
AC outlet. The grounding-type plug is an important safety feature. To avoid risk
of electric shock or damage to your equipment, do not disable this feature.
CAUTION: The rack-mountable ProLiant ML350 Generation 2 server
must
always be operated with the access panel on. Proper cooling cannot be
achieved if the access panel is removed.
Optimum Environment
When installing your ProLiant ML350 Generation 2 server into a rack, the
following requirements must be met:
Space
Power
Grounding
Temperature
Airflow
Space Requirements
To allow for servicing and adequate airflow, observe the following spatial
requirements when selecting a site for your rack-mounted server:
Leave a minimum clearance of 63.5 cm (25.0 inches) in front of the
rack.
Leave a minimum clearance of 76.2 cm (30.0 inches) behind the rack.
Leave a minimum clearance of 121.9 cm (48.0 inches) from the back of
the rack to the back of another rack or row of racks.
Vedere la pagina 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 47 48

Commenti su questo manuale

Nessun commento