Compaq ML350 - ProLiant - G2 Specifiche Pagina 37

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 48
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 36
Rack Installation 2-13
Compaq Confidential Need to Know Required
Writer: Jennifer Hayward Project: Compaq ProLiant ML350 Generation 2 Tower-to-Rack Conversion Guide Comments:
Part Number: 236991-001 File Name: c-ch2 Installing.doc Last Saved On: 6/19/01 8:36 AM
Installing the Server into the Rack
To install the server into the rack:
WARNING: To reduce the risk of personal injury or damage to the equipment, a
minimum of two people MUST lift the server into the rack. If the unit is loaded
above chest level, a third person must assist in aligning the rails while the other
two support the unit.
1. Pull the slide rails forward from the mounting brackets until they lock
into position.
2. Carefully align the server component rails with the rack slide rails, and
then slide the server all the way into the rack.
CAUTION: Be sure to keep the component parallel to the floor when sliding the
component rails into the slide rails. Tilting the component up or down can result
in damage to the rails.
Vedere la pagina 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 47 48

Commenti su questo manuale

Nessun commento