Compaq, the Compaq logo, and DIGITAL registered in United States Patent and Trademark Office. EK–SW4FC–IG. A01
StorageWorks is a trademark of Compaq Computer Corporation. October 1998
© 1998 Compaq Computer Corporation. All rights reserved. Printed in the U.S.A.
Compaq StorageWorks
Fibre Channel Hub Mount Kit
Installation Guide
This document describes how to install a fibre channel (FC)
hub using a FC hub mount kit into an Enterprise Storage
Array (ESA) 12000 cabinet.
Compaq recommends installing the hub below the lowest
enclosure in the cabinet.
Hub Mount Kit Contents
Use Table 1 to verify that all FC hub mount kit parts are
available.
Note
This kit only applies to DIGITAL RETMA
cabinets.
Preliminary Information
If installing more than one hub, mount subsequent hubs (up
to four) directly below the first hub (see Figure 1). Each
hub installation requires a 1U space.
Figure 1 Three-Hub Installation Example
Before installing a FC hub, a power cord for each hub being
installed must be installed. For multiple FC hub
configurations, Compaq recommends connecting primary
hubs to the primary PDU and secondary hubs to the
redundant PDU.
Table 1 FC Hub Mounting Kit Parts List
Description Qty
10-32 x 5/8 in Pan Head SEMS Screw 8
Flat Head Screw 4
U-Nut 8
Mounting Plate Bracket (74–60157–01) 2
Slide Bracket 2
CXO6622A
CXO6621A
Rear Mounting Bracket 2
Table 1 FC Hub Mounting Kit Parts List
Description Qty
CXO6620A
CXO6626A
Vedere la pagina 0
1 2 3 4

Sommario

Pagina 1 - Installation Guide

Compaq, the Compaq logo, and DIGITAL registered in United States Patent and Trademark Office. EK–SW4FC–IG. A01StorageWorks is a trademark of Compaq Co

Pagina 2 - Hub Installation Procedure

2 Power Cord Installation ProcedureComplete the procedure in Table 2 to install a power cord for each FC hub being installed.Hub Installation Proced

Pagina 3 - (Continued)

3 5. Remove four flat head screws (CALLOUT2) that originally came with the FC hub and discard them (two screws on the left side and two on the right