
COMPAQ StorageWorks Upgrading From an HSZ70 to an HSG80 Array Controller
Page 16 EK-HSG80-UP. B01
Perform the following steps:
1. Turn off the battery for the new cache module by
pressing the battery’s shut off button for five
seconds
2. Connect the battery to the new cache module.
3. Insert the new cache module in slot B within 4 minutes.
NOTE
A countdown timer allows a total of four minutes to install both
the cache module and controller. If you exceed four minutes,
“this controller” will exit FRUTIL and resume operations.
CAUTION
ESD can easily damage a controller or a cache module. Wear
a snug-fitting, grounded ESD wrist strap.
6. Disable the ECB to which you are connecting Cache Module B by pressing the battery
disable switch until the status light stops blinking—about five seconds.
CAUTION
The ECB must be disabled—the status light is not lit and is
not blinking—before connecting the ECB cable to the cache
module. Failure to disable the ECB could result in ECB
damage
Make sure you align the cache module and controller in the
appropriate guide rails. If you do not align the modules
correctly, damage to the backplane can occur.
7. Connect the new ECB cable to the ECB and the right side, Cache Module B.
8. Insert Cache Module B into its slot and engage its retaining levers. FRUTIL displays the
following:
Insert the controller module, WITH its program card, in slot B within 4 minutes.
9. Ensure that the program card is in the replacement controller and insert the new controller
into its slot. Engage its retaining levers. When fully seated, the newly installed controller will
boot.
FRUTIL displays the following:
If the other controller did not restart, follow these steps:
1. Press and hold the other controller’s reset button.
2. Insert the other controller’s program card.
3. Release the reset button.
Press return to continue.
Commenti su questo manuale